Skip to content
C
← Back to blog
Physics1 min readJune 18, 2024

SPC on the Shop Floor: When Your Control Chart Lies

Moving averages, tampering and forgotten MSA — three reasons a chart can look in control while the process is not. A practical guide.

SPC control chart on shop floor screen

Control ≠ capability

A control chart without a qualified measurement system (MSA) is a broken thermometer.

MSA first

  • %GRR <10% ideal, <30% tolerable
  • Bias vs standard
  • Resolution ≥5 distinct categories

Don’t over-average

Averaging 5 consecutive parts hides within-lot variation. Prefer Xbar-R/S for rational subgroups, XmR for individual readings.

Stop tampering

Adjusting the machine on every out-of-spec point amplifies variation (Deming’s funnel). Use Western Electric rules and a formal reaction plan.

Process physics explains variation; statistics makes it visible. One without the other is blind.

About the author

Charafeddine Barkat — Pharmacist, Technical Production Director & Physicist.

View profile →

Get the next post by email.